Transit advertising contracts are usually renewals. This one is a consolidation, and the difference matters for how the inventory will be sold.
The award
Intersection has announced that the Metropolitan Atlanta Rapid Transit Authority board of directors has awarded the company a new ten-year contract, expanding its scope to include exclusive control and sales management of bus shelter advertising across MARTA’s service area.
The award builds on Intersection’s existing management of MARTA’s bus and rail advertising portfolios, and unites all of the authority’s transit advertising assets under a single media partner.
Under the agreement, Intersection will operate and monetise more than 400 transit shelters comprising 822 static advertisement panels and 48 digital displays. Transition activities begin immediately, ahead of the official operational launch on 1 January 2027.
“We are thrilled to deepen our long-standing relationship with MARTA and consolidate all of their transit advertising assets under one roof,” said Scott Goldsmith, president and chief operating officer at Intersection. “By bringing the bus shelter network into our portfolio, we offer brands an unmatched, integrated audience reach across the entire Atlanta metropolitan region.”
What consolidation actually buys
Selling transit advertising in a fragmented way produces a predictable problem: the buyer has to assemble a campaign from several contracts, each with its own rate card, creative specification, reporting format and sales contact.
Atlanta’s fragmentation was structural – bus, rail and shelters were managed as separate portfolios even where they served the same journey. A commuter who walks past a shelter, boards a bus and transfers to rail is one audience, but was previously three media products.
Consolidation turns that into one. It allows a single campaign to follow a defined route across formats, and it allows the seller to offer reach and frequency numbers for the whole journey rather than for each stage of it.
The practical benefit for advertisers is fewer contracts and one reporting stream. The strategic benefit is that the seller can now price on audience rather than on asset, which is where transit advertising has historically lost value against other channels.
The digital upgrade inside a static contract
The most consequential detail is the ratio: 822 static panels against 48 digital displays.
That is a contract whose inventory is still overwhelmingly printed, and Goldsmith confirmed that Intersection is preparing to upgrade nearly all existing digital displays to deliver “a modernised, high-impact platform for advertisers”.
Digital displays in a shelter network do two things that static panels cannot. They allow dayparting – a shelter outside a school at 8am and outside a restaurant at 8pm can carry different creative – and they allow a single site to serve multiple advertisers in rotation, which raises yield per square metre of structure.
The catch is cost. Converting a shelter to digital requires power, connectivity and a hardened display, and in a network of 400-plus shelters the capital requirement is substantial. That is precisely why the contract runs ten years: the operator needs a long enough term to amortise the conversion, and the authority needs a partner with the capital to do it.
New shelters as a revenue instrument
The agreement also allows Intersection to convert non-advertising shelters and to build new locations in high-traffic corridors.
That clause is the commercial engine of the deal, and it is worth understanding why authorities grant it.
A city gets bus shelters because someone pays for them. Where an authority cannot fund street furniture from its own budget, it grants advertising rights in exchange for infrastructure – the operator installs and maintains the shelters, sells the advertising, and shares revenue with the transit agency.
Allowing the operator to build new sites in high-traffic corridors means the authority gets more shelters in places that need them, and the operator gets new inventory in places where it can sell it. The alignment is genuine but not perfect: the corridors with the highest advertising value are not always the corridors with the greatest passenger need, and the negotiation over which sites get built is where these contracts are actually decided.
“Unifying our bus shelter, bus, and rail advertising portfolios under a single, cohesive strategy with Intersection is a strategic win for MARTA,” said MARTA general manager and chief executive Jonathan Hunt. “This streamlined partnership maximises the financial value generated from our assets, and this new revenue stream will support our ongoing improvements.”
The wider Intersection position
Intersection operates transit, street furniture and airport advertising across a set of North American markets including Philadelphia, Boston and San Francisco, along with regions such as New Jersey, Minneapolis, Seattle, Pittsburgh and Portland.
The company states that its network reaches more than 50 million people monthly through more than 400,000 digital and static assets nationwide.
Atlanta adds one of the largest transit agencies in the United States, serving Fulton, DeKalb and Clayton counties and connecting to Hartsfield-Jackson Atlanta International Airport – the busiest airport in the world by passenger numbers, and therefore a corridor with unusually valuable audiences.
What other cities should read into it
Two lessons stand out for authorities preparing to tender transit advertising.
The first is that fragmentation costs money. Splitting bus, rail and shelter inventory across multiple contracts reduces the value of each, because no single buyer can offer a journey-level audience story. Consolidating into one contract raises the ceiling on what the inventory can earn, at the cost of concentration risk.
The second is that contract length and capital investment are inseparable. A ten-year term is what makes a digital conversion financeable; a five-year term would have produced a contract with no upgrade path. Authorities that want modern digital transit advertising have to accept longer terms, and they should extract infrastructure commitments in exchange – new shelters, maintained structures, and a conversion schedule with dates rather than intentions.
Why it matters, in one line
Ten years and 400-plus shelters is a capital commitment disguised as a media contract – Atlanta has traded contract length for a digital upgrade it could not otherwise fund, and the operator has bought the right to build new inventory where it chooses.
Source: DailyDOOH, “New @Intersection_Co MARTA Ad Contract”, 20 November 2026.
